Tam Dao 3 drilling rig project

Table of contents

    DMC & QME Joint Venture in the project of building a new 90m water jack-up rig of the Petroleum Drilling Rig Manufacturing Company (PVMS)

    QME is a contractor in the QME - DMC joint venture to perform the hydraulic pipeline cleaning in the project of building a new 90m water jack-up rig of the Vietsopetro Joint Venture. The general contractor is PVMS Company.

    With a total volume of 1500m of pipe, the largest pipe size is 3" This system includes cast steel pipes and is connected by welding method. Divided into 02 systems HS and HB. The cleanliness requirement after cleaning is NAS 6. The technical requirement is that the pipeline must be cleaned of rust, rust residues arising during the pipe casting process, welding slag and foreign objects during the construction and installation process.

    With strict requirements on technical, service quality and issues of marine environmental safety, labor safety in oil and gas projects. The QME-DMC joint venture has strived to complete ahead of schedule set by the investor and general contractor. The US supervision experts assessed it as: "Excellent completion of technical standard requirements"

    In addition, during the implementation process, QME supported the drilling equipment supplier TTS (Finland) to clean the pipes that had been assembled on the drilling tower, and handle leakage incidents on the pipes

    Implementation time: 28 days including 02 services: Flushing with hydraulic oil and Flushing with chemicals

    Project implementation: Service team - QME

    Completion date: December 2, 2011