Installing 8 propeller systems for Truong Sa ship

Table of contents

    In June 2012, QME signed a service contract within the project package "Installation of 8 hydraulic systems to control propellers" with the main contractor AnPha Company.

    QME's scope of work is as follows:

    • Pipeline flushing equipment rental (total 3490m, with maximum pipe diameter 5”) including the following equipment:

    + 02 chemical pumping stations 40 m³/h

    + 03 Flushing stations with total capacity 194Kw, 12 branches, 2900 l/p, pressure 30-60bar (depending on branch)

     

     

    • Providing specialized degreasing and rust removing chemicals.
    • Supplying Hydac oil filter cores – Germany (1300 l/p, 3 Micron Model: 1300 R 003 BN4HC)
    • Pipe crimping service at the construction site (on Truong Sa ship). Largest pipe 2” – 6 layers of steel fabric)
    • Requirement for pipe cleanliness to reach NAS 5 (equivalent to ISO 4406: 16/14/11) Investor: Dung Quat Shipbuilding

     

    Some pictures of equipment used for the project:

    • 3 washing stations. 90KW station

    60KW station

    44KW Station

    P32 tube crimping machine

    SK03 Pipe Peeling Machine