Maruichi Sunsteel Steel Plant Pipeline Cleaning Project

Table of contents

    On January 3, 2013, QME implemented a contract for hydraulic pipe cleaning at Sunsco cold-rolled steel factory in Tan Dong Hiep Industrial Park, Di An, Binh Duong

    This contract is part of the installation package of the color-coated steel production line of Maruichi Sunsteel Company. The work contents include:

    • Cleaning rust in pipes with chemicals.
    • Cleaning pipes with hot oil.

    This is a large steel production line installation project in Vietnam. Closely supervised by Japanese engineers from Mitsubishi - Hitachi Joint Venture

    Package 1: Hydraulic pipe flushing for CCL line Pipe volume: Including 02 power station clusters and 14 valve clusters.

    Implementation time: 15 days

    Required standards: NAS 5 -- NAS6 for CPC pipe clusters

    Performing staff: 01 commander and 7 service engineers

    Engineering general contractor: Chugairo - Japan

    Construction contractor: Soltec Vietnam

    Pipe processing contractor: TAK Vietnam

    Equipment supplier: Mitsubishi - Hitachi

    Completion date: 27/12/2012

    Package 2: Hydraulic Pipe Flushing for CGL Line

    Pipeline Volume: Including 03 power station clusters and 14 valve clusters.

    Maximum pipe size: DN125

    Required standards: NAS 5 -- NAS6 for CPC pipe clusters

    Manpower: 01 commander and 7 service engineers

    Investor: Maruichi Sunsteel

    General contractor for installation: Lilama 18 Joint Stock Company

    Equipment supplier: Mitsubishi - Hitachi

    Performance period: 30 days

    Completion date: April 11, 2013

    QME completed the contract on schedule, ensuring technical and safety standards and meeting environmental standards, which was highly appreciated by the investor as well as general contractors at the project.